Skip to content
PROMETHEASOPTICAL Send a project enquiry
Reference library

South Sudan Bridge Material

Published
  • South
  • Sudan
  • Bridge
Research context

Reference summary

The original Nile bridge crossing at Juba was built in 1974 by the Dutch construction company De Groot International under a United Nations programme. The paid about one million dollar. The total cost of the bridge was 2.5 million.

The Dutch government put up the remaining 1.5 million. On 15 March 1974 it was opened by general. Up until that time an irregular ferry service was the only way to cross the Nile river for hundreds of miles.

After the Suda.

Additional context

Source notes

The original Nile bridge crossing at Juba was built in 1974 by the Dutch construction company De Groot International under a United Nations programme. The paid about one million dollar. The total cost of the bridge was 2.5 million. The Dutch government put up the remaining 1.5 million. On 15 March 1974 it was opened by general . Up until that time an irregular ferry service was the only way to cross the Nile river for hundreds of miles. After the Suda…

From reference to enquiry

Questions for your project

Use these editorial prompts alongside the linked excerpts. They identify items to confirm for your project.

Technical notes

Illustrative equipment image

structural-performance-oftimber-composite-bridges-forrural

This study has characterised the structural performance of three timber-composite bridge types under South Sudan material and climate conditions through laboratory testing, FEA, field load testing, and

Structural Performance ofTimber-Composite Bridges forRural

South Sudan has an estimated rural bridge deficit of 680 crossings below 25 m span, representing the primary physical barrier to year-round agricultural market access, emergency

Juba Nile Bridge

The original Nile bridge crossing at Juba was built in 1974 by the Dutch construction company De Groot International under a United Nations programme. The United Nations High Commissioner for Refugees paid about one million dollar. The total cost of the bridge was 2.5 million. The Dutch government put up the remaining 1.5 million. On 15 March 1974 it was opened by general Gaafar Nimeiry. Up until that time an irregular ferry service was the only way to cross the Nile river for hundreds of miles. After the Suda

South Sudan Bridge Construction Market (2025-2031)

Market Forecast By Type (Beam Bridge, Truss Bridge, Arch Bridge, Suspension Bridge, Cable-Stayed Bridge, Others), By Material (Steel, Concrete, Composite Material), By Application (Road & Highway,

Completion of the Freedom Bridge — South Sudan''s

Traffic jams are commonplace in the capital city of Juba. Construction began in 2013. A large number of massive machines and materials

Freedom Bridge Project

The project laid the foundation for building a new South Sudan and stands as a symbol of recovery, reconciliation, unity, and international cooperation after overcoming the civil conflict and the COVID‐19.

Design Manual South Sudan PDF | PDF | Road Surface | Asphalt

The South Sudan Ministry of Roads and Bridges is the custodian of the series of technicalmanuals and other reference documents that are written for the practicing engineer in SouthSudan.

SOUTH SUDAN LOW VOLUME ROADS DESIGN MANUAL

A broad category of particulate material including sand, gravel, crushed stone, slag and recycled material that forms a component of composite materials such as concrete and pre-mix asphalt.

World Bank Document

South Sudan is bisected roughly by the Nile River which is surrounded by a gently sloping to flat basin into which the highlands of the surrounding countries drain.

South Sudan Construction Material Market (2025-2031) | Trends,

6Wresearch actively monitors the South Sudan Construction Material Market and publishes its comprehensive annual report, highlighting emerging trends, growth drivers, revenue analysis, and

IMPLEMENTATION REVIEW STUDY REPORT ON THE PROJECT

Note) * The section which is referred to the Preparatory Survey Report on the Project for Construction of Bridges in Juba City in the Republic of South Sudan (2016)

Technical Notes

Technical Notes Building in this location and context presents many challenges. South Sudan''s infrastructure was devastated by 20 years of civil war, and

Freedom Bridge (South Sudan) Explained

The Freedom Bridge in Juba, South Sudan, is South Sudan''s second permanent bridge over the Nile, the first being the Juba Nile Bridge, a Bailey type bridge built in 1976.

PREPARATORY SURVEY REPORT ON THE PROJECT FOR

Japan International Cooperation Agency (JICA) decided to conduct the preparatory survey on the Construction of Nile River Bridge in the Republic of South Sudan and organized a survey team

Freedom Bridge (South Sudan)

The Freedom Bridge in Juba, South Sudan, is South Sudan''s second permanent bridge over the Nile, the first being the Juba Nile Bridge, a Bailey type bridge built in 1976.

Construction materials Bulk Supplier in South Sudan

Construction materials in Juba from wide range of pipes & bars, steel binding wire, water tanks in 3k, 5k, 10k litters & many. more Contact now +211-921055700

Juba Nile Bridge

Juba Nile Bridge Built shortly after the 1972 peace agreement, under the regime of Jaafar Nimeiri, the 252m-long Juba Nile Bridge is, up to today, the only bridge over the White Nile in South Sudan.

Juba Bridge marks 50 years as South Sudan''s lifeline

Africa-Press – South-Sudan. Juba Bridge, probably one of South Sudan''s oldest and most important infrastructures still stands strong and serves

Share your network requirements

Share the fiber interfaces, termination capacity, cable route and evidence required for handover.

Send a project brief